Representative principal experience

Practical systems.
Documented experience.

Organize the Data. Automate the Process. See the Business.

The same approach applies across different operating environments: understand the work, organize the information and make the system useful to the people who depend on it.

Two environments.
One disciplined approach.

Explore the full project stories below, from the operating challenge and implementation approach to documented outcomes and technologies.

The organizations are anonymized. These accounts describe work completed by John Mestyanek in prior and current employment; ongoing and planned work is identified in each story.

The Challenge

A fast-growing digital education and consulting company generating approximately $2 million in annual revenue had scaled without a unified data or systems strategy. Sales, Marketing, Consulting, Operations and HR relied on disconnected spreadsheets, application-specific data and manual reporting. Department managers often spent half a day gathering information for leadership, while success was largely judged through monthly profitability, social-media engagement and conversion activity.

As the organization grew toward approximately 44 employees, fragmented data made it difficult to understand performance, enforce consistent processes or identify operational problems quickly. The company needed more than dashboards—it needed a structured information and workflow environment that could support day-to-day operations and leadership decisions.

Scope

  • Data cleanup, standardization and restructuring across departments
  • KPI definition and live leadership reporting
  • Workflow and process design
  • CRM and business-system implementation
  • Automation architecture using triggers, actions and cross-system workflows
  • REST API integrations and application credentials
  • UTM-based marketing attribution and conversion tracking
  • User access, permissions, documentation and manager training
  • WordPress pages, forms, popups, e-commerce integrations and troubleshooting

Approach

Golden Seed Ventures’ principal began by making the existing information usable before introducing new technology. Sales data was cleaned and reorganized into a live reporting structure that displayed total sales, sales over time, sales by category, sales by representative and average sales, with adjustable date views and automatically updated tables.

The same approach was then applied across the organization. Department leaders were interviewed to understand what they needed to measure, how work moved through their teams and where information should be stored. Those discussions became data maps, workflow designs, field structures, triggers, actions, dashboards and access rules.

One of the most complex migrations involved Consulting data distributed throughout ClickUp. Information had to be extracted from multiple locations, cleaned, standardized, restructured and mapped into a newly designed Monday.com environment so consultants could maintain it consistently going forward.

Solution

A company-wide operational system was built in stages. Early spreadsheet and dashboard work created immediate visibility, followed by a broader Monday.com implementation with department-specific workflow boards, automated task movement, reporting dashboards, finance requests, IT and customer-service ticketing, and integrations with email, Zoom and other applications.

The environment later evolved into a broader Zoho implementation. Acting as the internal system owner, Golden Seed Ventures’ principal translated business requirements for outside implementation consultants while helping configure CRM, Forms, Analytics, Desk, Campaigns, HR, Commerce and related applications. This included sales-pipeline automations, purchase and customer-email workflows, profile updates based on Sales and Consulting interactions, list management, and REST API connections used to bring social, YouTube, website and financial information into analytics reporting.

Marketing attribution was also strengthened through UTM tracking. Campaign-specific links made it possible to follow traffic from individual social posts to the website, observe subsequent activity and determine whether a visitor ultimately booked a sales call through a form—creating a clearer connection between content, leads and high-ticket phone sales.

Operational Discovery

Better data exposed problems that had previously been difficult to see. Consulting analysis showed that many advertised hour-long student calls were routinely ending after only 15–20 minutes, notes were inconsistent, and next-step guidance and encouragement were not being delivered reliably.

Leadership used this visibility to retrain consultants, make personnel changes, promote additional floor-level management, identify where students were struggling and ultimately revise the online course itself to provide more current and targeted education.

Outcomes

  • Replaced fragmented departmental reporting with readily available KPI visibility for leadership.
  • Reduced manager reporting preparation from hours of manual gathering to approximately one-hour performance reviews using already-available information.
  • Built systems and workflows ultimately used across an organization of approximately 44 employees.
  • Established repeatable Sales, Marketing, Consulting, Operations and HR workflows rather than relying on disconnected spreadsheets and application silos.
  • Enabled leadership to identify service-delivery gaps that drove retraining, staffing adjustments, stronger oversight and course redesign.
  • Created marketing attribution from social content through website activity and booked-call conversion.
  • Established integrations and reporting pipelines across CRM, social, website, e-commerce and financial systems.
  • Transitioned from primarily data-analysis work into internal systems ownership, business-process translation, automation design, permissions management and user enablement.

Technology

Google Sheets · SQL · ClickUp · Monday.com · Zoho CRM · Zoho Forms · Zoho Analytics · Zoho Desk · Zoho Campaigns · Zoho HR · Zoho Commerce · REST APIs · UTM Tracking · WordPress · Zoom · Metricool · Look · Cronos

Capabilities Demonstrated

Data Structuring & Cleanup | Business Process Mapping | Dashboard & KPI Design | Workflow Automation | CRM Architecture | Systems Integration | REST APIs | Data Migration | Marketing Attribution | User & Permission Management | Training & Adoption | Website & Form Integration

The Challenge

A major electric utility was preparing Distribution asset information for an eventual transition from legacy SharePoint-based records through Doble PowerBase and ultimately into a newer enterprise asset-data platform. Transmission already used PowerBase, but Distribution had only limited device classes represented in the system. Much of the remaining information was dispersed across group spreadsheets, department-specific files, settings files and project folders throughout SharePoint.

The challenge was not simply moving data. Distribution needed a scalable structure capable of representing different types of grid-protection environments, preserving relationships among assets and devices, storing settings and testing information, supporting field workflows, and creating a cleaner foundation for future migration. Missing asset data, inconsistent naming and the need for stakeholder agreement added complexity.

Scope

  • Distribution asset and device data architecture
  • Stakeholder requirements gathering and terminology standardization
  • Three-tier asset hierarchy and relationship design
  • Device nameplate fields, dropdowns, statuses and settings structures
  • PowerBase mass-import and device-linking templates
  • Data cleanup, normalization and validation
  • RTS / FasType settings integration support
  • Oracle SQL analysis and troubleshooting
  • Tableau work-order progress reporting
  • Automated data-quality reporting
  • Standards, user guidance and PowerBase support
  • Preparation of legacy Distribution data for future platform migration

Architecture

A reusable three-tier model was developed to accommodate both traditional field protection and complex location-based projects.

Tier 1 represents the highest-level grouping. For standalone field devices, the grouping is based on Protection Scheme. For complex environments containing multiple asset and protection types—such as switchyards, network vaults and airport infrastructure—the Tier 1 grouping is based on Project or Location.

Tier 2 represents the larger physical or functional asset, including equipment such as switchgear, transformers and Main-Tie-Main configurations.

Tier 3 contains the individual devices associated with those assets, including batteries, relays, switches and communications equipment. Substations and feeders are also maintained at this level and linked to the appropriate Tier 2 asset grouping rather than being directly associated in a way that would limit reuse.

This model originated with the Switchyard buildout and proved adaptable as additional Distribution environments were introduced.

Approach

For each new device or asset type, requirements were developed through structured conversations with department managers and subject-matter stakeholders. Discussions focused on what equipment participates in protection of the asset, which data needs to be tracked, terminology familiar to field users, required nameplate information, whether the device contains settings, and how relationships should be represented.

Based on those requirements, the PowerBase structure was designed: field types and layouts, dropdowns, status values, device relationships, settings structures and upload requirements. Where settings were required, FasType names and tracked settings were defined in PowerBase and coordinated with the team responsible for the RTS testing side so the systems could be linked and tested together.

The Switchyard work represented the first Distribution environment built from the ground up. With no pre-existing PowerBase structure, project folders were reviewed, a data-capture spreadsheet was created for each structural level, stakeholder requirements were gathered, incoming information was cleaned and organized, and PowerBase upload templates were prepared for Tier 1 through Tier 3 assets and devices.

Data Migration & Quality

PowerBase bulk imports require device- or settings-specific templates with exact fields and relationship identifiers. Separate link templates are used when devices must be linked rather than directly associated. Data therefore has to be cleaned, mapped and placed in the correct columns before import so that assets, devices, settings and relationships are created correctly.

This repeatable import process saves days compared with manual record creation and is being used to bring fragmented Distribution information into a governed structure. Where information is unavailable, the architecture can still be created and records can be backfilled after data collection or field verification.

SQL is used to validate and compare records across PowerBase environments and diagnose data issues. In one example, an incorrect date format was introduced during a settings import; SQL was used to identify the affected records and support correction. For complex settings stored across different FasTypes/templates, built-in PowerBase reporting was used to expose the underlying SQL, which was then adapted into reusable queries for additional settings templates.

Reporting & Operational Visibility

A PowerBase report was connected to Tableau and combined with current employee information to track completion of a regional work order. Progress could be viewed from individual device level through district and region, giving district managers a clearer way to monitor field activity and keep work on schedule.

A recurring monthly report was also established for district managers to identify substation naming mismatches. Previously, these issues could remain unnoticed until a report was requested, allowing inaccurate naming to persist. The automated report surfaces discrepancies sooner so records can be corrected and managers can address process issues with their teams.

Additional lifecycle reporting, including battery-expiration visibility, is planned as remaining device and historical data are backfilled.

Scale

  • Approximately 5,000 Intellirupters and 3,500 Reclosers, each with associated relays, switches, communications devices, batteries, stations and feeders.
  • Approximately 50 Switchyards, generally containing 5–20 major assets per yard plus related devices.
  • Just under 50 network vaults, generally containing 2–6 major assets per vault plus related devices.
  • Airport infrastructure containing more than 100 major assets plus associated devices.
  • Overall environment encompassing thousands of assets and tens of thousands of device relationships.

Outcomes

  • Created a reusable Distribution asset hierarchy where no PowerBase structure previously existed for Switchyards.
  • Established a model that successfully extends to network vaults, airport infrastructure and other complex location-based groupings.
  • Standardized required fields, dropdowns, device relationships and settings structures through stakeholder-driven requirements.
  • Replaced large volumes of manual record creation with structured mass-upload processes capable of saving days of work.
  • Improved operational visibility through Tableau work-order reporting from device through district and regional levels.
  • Automated recurring data-quality reporting, reducing manual report preparation and helping managers correct naming discrepancies sooner.
  • Created standards and trained users on adding new assets; PowerBase users increasingly route questions directly to the system owner.
  • Positioned Distribution data to follow the same PowerBase-to-new-platform migration process used by Transmission, reducing future preparation work before enterprise migration.

Technology

Doble PowerBase · Doble RTS · FasTypes · Oracle SQL · Toad · Tableau · SharePoint · Excel · PowerBase Report Builder

Capabilities Demonstrated

Data Architecture | Asset Hierarchy Design | Requirements Gathering | Data Migration | Data Standardization | Bulk Import Engineering | SQL Validation & Troubleshooting | Operational Reporting | Tableau Dashboards | Data Quality Automation | Systems Integration | Technical Standards | User Training | Legacy-System Modernization

Start with the operating problem

What is getting in the way of your next step?

Tell us what you are trying to improve, which tools you use and where the work gets stuck. We can discuss the scope, priorities and a practical starting point.

Discuss your project

[email protected]